Power Purchase Agreement (AAE) and Implementation Agreement, International law firm (issued in 2006) for Pakistan`s Private Power and Infrastructure Board – Standard Electricity Docking Contract and Fossil Fuel Implementation Agreement developed by the International Law Firm for Pakistan`s Private Power and Infrastructure Board, as well as a Pricing Schedule Model for the PPP and the Directive that established the general framework that led to the development of the three standard policy forms documents 2002 ( PDF). Kenya – Electricity Purchase Contract (AAE) – Simplified agreement for Kenya A relatively simplified electricity purchase agreement has been developed for Kenya`s electricity regulator for use in „Hydro, Geothermal or Gas“ electricity generation facilities. It expects a capacity load and an energy load. The seller must sell all the net electrical power of the installation to the buyer. The Energy Regulatory Commission also provides a link to a PPP model for large renewable generators over 10 MW and an AAE for smaller renewable energy projects of less than 10 MW on its renewable energy portal. Electricity purchase contract (AAE) for small rural energy projects as part of a series of documents developed by international law firms for use in small rural energy projects. Documents prepared for the country in Southeast Asia. Pacificorp Power Purchase Contract (AAE) for large power plants (pdf) – Pacificorp`s proposed power purchase contract for power plants with a net capacity of more than 1000 kilowatts – relatively short agreement. Designed in the context of the U.S.

regulatory structure. These are examples of this type of PPP that are listed below. AAEs have been subdivided into AAEs that are more relevant to smaller and more rural energy projects, and more complex AAEs, relevant to large projects in developing countries. Long-term project of an electricity supply contract (AAE) of the Electricity Regulatory Commission (CERC) (for projects for which location and fuel are indicated) (pdf) – Draft electricity supply contract developed by CERC for the Indian PPI market – for long-term agreements (more than 7 years) for the construction of power plants in which the site is not indicated. A link is the draft request for submissions – for the ppA project, you go to page 70. For a more detailed analysis of AAE issues of this type, see ifC`s guide to electricity purchase contracts (1996) – see Appendix 2 (page 160) of the World Bank concession toolkit (pdf). The above AAEs must be distinguished from electricity purchase contracts in a deregulated electricity market, which are generally contracts to purchase electricity from a private generator where the plant already exists or when the plant is built at the initiative of the private generator.